Quick answer: most homes with solar panels can add a battery without replacing the panels. A retrofit battery either connects alongside your current inverter (AC coupled) or replaces it with a hybrid inverter that runs both. Until 31 March 2027, adding a battery to existing solar qualifies for 0% VAT.

If you already have panels on the roof, you have probably noticed the mismatch. Your system produces the most electricity around midday, while your household uses the most in the morning and evening. Much of that afternoon generation goes to the grid, and you buy electricity back after dark. Adding a battery to existing solar panels closes that gap. This guide walks through the process in the order it actually happens.

Step 1: Find Out What You Already Have

Before anyone can recommend a battery, they need to know what is on your roof and in your loft. Gather what you can:

  • The make and model of your inverter, usually printed on a label on the unit.
  • The size of your system in kilowatts peak (kWp), which will be on your installation paperwork or MCS certificate.
  • The year it was installed.
  • Recent electricity bills, or access to your monitoring app.

None of this is essential, as an installer can find it on a visit, but having it to hand makes the first conversation far more useful.

Step 2: Check Whether You Receive the Feed in Tariff

Older systems registered before April 2019 may still receive Feed in Tariff (FiT) payments. Adding a battery does not stop those payments, but the battery has to be connected so that your generation meter still measures only what the panels produce.

Ofgem’s guidance is clear on two points. You must tell your FiT licensee when a battery is connected, and payments continue as long as generation (and export, if it is metered) can still be measured accurately and separately. You can read the detail on Ofgem’s FiT generator page. A good installer will design the connection around this from the start.

Step 3: Choose Between AC Coupled and Hybrid

This is the main technical decision in any retrofit, and it usually comes down to the age and condition of your current inverter.

  • AC coupled battery: the battery comes with its own inverter and sits alongside your existing one. Your current setup stays in place, which often makes this the simplest route for older systems and FiT homes.
  • Hybrid inverter: your existing inverter is replaced with one that manages the panels and the battery together. This can make sense if your inverter is nearing the end of its life anyway, since you solve two jobs at once.

Our guide to hybrid inverters explained in plain English covers how they work in more depth.

Step 4: Size the Battery to Your Evenings

Battery capacity is measured in kilowatt hours (kWh). The right size depends on two numbers: how much surplus your panels produce on a typical day, and how much electricity you use between late afternoon and the next morning.

Oversizing is a common mistake. A battery that is too large for your system may rarely fill in winter, while one that is too small runs flat before the evening is over. If you would like to understand the sums, our article on how many kWh of storage your home needs is a good place to start.

Step 5: Plan the Location and the Paperwork

Batteries are usually wall mounted in a garage, utility room or similar space with good ventilation and access. Your installer will also check that your fuseboard and supply can take the extra equipment.

There is paperwork too. Your local electricity network operator needs to be told about new generating and storage equipment, and the rules depend on how much power your combined system can export. Our explainer on the 16 amps per phase rule sets out why this matters.

Step 6: Installation Day and Setting It Up

Most retrofit battery installations are completed in a single day. Expect the power to be off for part of it while the battery is connected and tested. Before leaving, the installer should set up the battery app, show you how to read it and explain the charging settings.

Spend the first few weeks watching how the battery behaves. In winter you may want it to charge from the grid overnight on a cheaper rate, which is a setting rather than a hardware change.

What About VAT?

Since 1 February 2024, batteries retrofitted to an existing solar system have qualified for the same 0% VAT rate as new installations in homes. As of November 2026, that rate runs until 31 March 2027, after which it rises to 5%. The Autumn Budget on 28 October 2026 did not extend it. HMRC sets out the rules in VAT Notice 708/6, and our guide to the 0% VAT deadline explains what it means for your timing.

Batteries We Fit

Sheerwater Solar installs batteries from Tesla Powerwall, SolarEdge Home Battery, Huawei, myenergi libbi, Growatt and GivEnergy. The right choice depends on your existing inverter and how you want the system to behave, which is why we look at your setup before recommending a brand. If you are still deciding whether storage is worthwhile at all, read is battery storage worth it? first.

Your Retrofit Checklist

Save this list for your first conversation with an installer:

  • Inverter make, model and age noted.
  • System size (kWp) and installation year found.
  • FiT status confirmed, and your FiT licensee’s details to hand.
  • A rough idea of your evening and overnight electricity use.
  • A possible location for the battery in mind.
  • Future plans considered, such as an EV or a heat pump.
  • Installation booked in good time if you want the 0% VAT rate.

Ready to Add Storage?

Our battery installation service covers retrofits to existing solar systems across Surrey and the surrounding areas. Get in touch or call 01932 627 555, tell us about your current system, and we’ll get back to you within 24 hours to talk through your options.

Get in touch today

We'll get back to you within 24 hours.

Reaching out to Sheerwater Solar is straightforward and hassle-free. Whether you’re interested in solar panels for your home or business in Woking, we’re here to guide you every step of the way. You can contact us directly by calling 01932 627 555 or by sending an email to info@sheerwatersolar.co.uk.

Alternatively, fill in our online form for a swift response.

What happens next?

In most cases, we’ll need to conduct an on-site survey at your property to assess the feasibility and provide you with a tailored quote. This visit allows us to understand your specific needs and explore the potential for renewable energy solutions. Following the survey, we’ll discuss the best options for integrating solar energy into your property, including detailed costs and the installation process.

We’re excited to assist you on your journey to renewable energy and look forward to hearing from you.